WBS Project Material List Dictionary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Constraints |
Material availability, special
order lead-times, contractor scheduling, weather delays, work stoppage for
phase inspections |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Schedule Milestones |
Unable to create milestones until
purchase and service contracts are made |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work will be
done in order of importance then listed from lower level up in material
list. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First Floor system |
|
|
|
|
Description of
Work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item |
Price |
Quantity |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2"x10"x16' |
$18.37 |
5 |
$91.85 |
|
Remove
damaged section of floor, remove damaged rim and joists, replace rim and
joists with Simpson StrongTie fastners (joined over load-bearing existing
wall), and replace 3/4" T&G Ply |
|
|
|
|
|
3" 16D CC |
$45 |
2 |
$90 |
|
|
|
|
|
|
3/4"x4'x8' T&G ply |
$31.43 |
6 |
$188.58 |
|
|
|
|
|
|
Simpson Ties/Hangers |
$85 |
1 |
$85 |
|
|
|
|
|
|
|
|
|
$455 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Basement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3-1/2"x16" batt insulation (126
sq.ft.) |
$37.50 |
7 |
$262.50 |
|
|
|
|
|
|
|
|
|
|
|
1/2"x4'x8' Drywall |
$9.11 |
30 |
$273.30 |
|
Insulate
pre-constructed 16" bays, place recessed lighting throughout basement
rooms, install bathroom package, apply drywall, fit interior/exterior doors,
apply trim, paint and finish fixtures. |
|
|
|
|
|
tape 250' |
$1.85 |
5 |
$9.25 |
|
|
|
|
|
|
fastners |
$43.55 |
1 |
$43.55 |
|
|
|
|
|
|
Drywall 5 Gal |
$17.64 |
3 |
$52.92 |
|
|
|
|
|
|
3068 6 Panel Steel Insulated |
$237.50 |
1 |
$237.50 |
|
|
|
|
|
|
WM623 Col Base (16') |
$0.69 |
144 |
99.36 |
|
|
|
|
|
|
WM623 Col Casing |
$0.59 |
96 |
$56.64 |
|
|
|
|
|
|
3068 6 PNL HC PH Primed |
$94.99 |
2 |
$189.98 |
|
|
|
|
|
|
|
|
|
|
|
2668 6 PNL HC PH Primed |
$75.02 |
1 |
$75.02 |
|
|
|
|
|
|
|
|
|
|
|
Recessed Light Package HALO LED |
$118 |
3 |
$354.00 |
|
|
|
|
|
|
|
|
|
|
|
Bathroom Package* |
$1,100 |
1 |
$1,100.00 |
|
|
|
|
|
|
|
|
|
|
|
Paint 5 gal |
$95 |
2 |
$190.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$2,944.02 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First Floor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2"x4"x8' framing |
$3.50 |
70 |
$245.00 |
|
|
|
|
|
|
|
|
|
|
|
3-1/2"x16" batt insulation (126
sq.ft.) |
$37.50 |
10 |
$375.00 |
|
Remove
damaged framing, replace with NC framing materials, frame for NC windows,
insulate 16" bays, install recessed lighting throughout rooms per
layout, install windows, install drywall, fit interior/exterior doors,
install kitchen package, apply trim, paint and finish fixtures. |
|
|
|
|
|
1/2"x4'x8' Drywall |
$9.11 |
54 |
$491.94 |
|
|
|
|
|
|
5/8"x4'x8' Fireguard |
$16.42 |
6 |
$98.52 |
|
|
|
|
|
|
tape 250' |
$1.85 |
8 |
$14.80 |
|
|
|
|
|
|
fastners |
$43.55 |
3 |
$130.65 |
|
|
|
|
|
|
Drywall 5 Gal |
$17.64 |
4 |
$70.56 |
|
|
|
|
|
|
3068 9Lite Steel Insulated |
$304.73 |
1 |
$304.73 |
|
|
|
|
|
|
3068 6 Panel Steel Insulated |
$237.50 |
2 |
$475.00 |
|
|
|
|
|
|
|
|
|
|
|
2068 6 PNL HC PH Primed |
$67.02 |
1 |
$67.02 |
|
|
|
|
|
|
|
|
|
|
|
3050 DH Vinyl NC Insul |
$255.21 |
8 |
$2,041.68 |
|
|
|
|
|
|
|
|
|
|
|
WM623 Col Base (16') |
$0.69 |
192 |
$132.48 |
|
|
|
|
|
|
|
|
|
|
|
WM623 Col Caseing |
$0.59 |
176 |
$103.84 |
|
|
|
|
|
|
|
|
|
|
|
Recessed Light Package HALO LED |
$118.00 |
4 |
$472.00 |
|
|
|
|
|
|
|
|
|
|
|
Paint 5 Gal |
$110 |
3 |
$330.00 |
|
|
|
|
|
|
|
|
|
|
|
Kitchen Package** |
$3,200 |
1 |
$3,200.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$8,553.22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Second Floor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2"x4'x8' Framing |
$3.50 |
110 |
$385.00 |
|
|
|
|
|
|
|
|
|
|
|
3-1/2"x16" batt insulation (126
sq.ft.) |
$37.50 |
9 |
$337.50 |
|
|
|
|
|
|
|
|
|
|
|
8-1/2"x24" attic insulation |
$52.10 |
8 |
$416.80 |
|
Remove
damaged framing, replace with NC framing materials, frame for NC windows,
insulate 16" bays, install recessed lighting, throughout rooms per
layout, install windows, install drywall, install 24" attic insulation,
fit interior doors, install bathroom package, apply trim, paint and finish
fixtures |
|
|
|
|
|
1/2"x4'x8' Drywall |
$9.11 |
67 |
$610.37 |
|
|
|
|
|
|
tape |
$1.85 |
9 |
$16.65 |
|
|
|
|
|
|
fastners |
$43.55 |
4 |
$174.20 |
|
|
|
|
|
|
Drywall 5 Gal |
$17.64 |
4 |
$70.56 |
|
|
|
|
|
|
2668 6 PNL HC PH Primed |
$75.02 |
4 |
$300.08 |
|
|
|
|
|
|
2068 6 PNL HC PH Primed |
$67.02 |
4 |
$268.08 |
|
|
|
|
|
|
3050 DH Vinyl NC Insul |
$255.21 |
7 |
$1,786.47 |
|
|
|
|
|
|
Bathroom Package*** |
$1,850 |
1 |
$1,850 |
|
|
|
|
|
|
|
|
|
|
|
WM623 Col Base (16') |
$0.69 |
224 |
$154.56 |
|
|
|
|
|
|
|
|
|
|
|
WM623 Col Casing |
$0.59 |
240 |
$141.60 |
|
|
|
|
|
|
|
|
|
|
|
Recessed Light Package HALO LED |
$118.00 |
5 |
$590.00 |
|
|
|
|
|
|
|
|
|
|
|
Paint 5 Gal |
$110 |
4 |
$440.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$7,541.87 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interior Flooring |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Carpet and Install |
$3,800 |
1 |
$3,800.00 |
|
Install
carpeting before trim is applied
(Includes strips, pad, carpet and transitions) |
|
|
|
|
|
|
|
|
$3,800.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Exterior |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Paint 1 Gal |
$23 |
2 |
$46 |
|
Powerwash
brick, remove chipped paint from existing exterior trim, replace unsecured
shingles at gable end, expanding foam insulation for window and door
cavities, paint trim, contracted lawn service for exterior brush and garbage
removal, seed and rake lawn |
|
|
|
|
|
25 yr Asphalt shingle per bundle |
$30 |
2 |
$60 |
|
|
|
|
|
|
Brick Wash |
$430 |
1 |
$430 |
|
|
|
|
|
|
Spray insulation/Caulking bundle |
$347 |
1 |
$347 |
|
|
|
|
|
|
Seed/Trim/Brush and Refuse Removal |
$700 |
1 |
$700 |
|
|
|
|
|
|
|
|
|
$1,583 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$24,422.11 |
|
Materials
are priced at current market value (discount not applied). All materials quoted meet current
construction code requirements.
Acceptable outcome for project budget will be completion at or below
the cost of materials listed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
* Bathroom
package includes frameless shower stall and fixtures, sink with fixtures and
storage base, wall mount cabinet, laminated flooring and low-flow toilet |
** Kitchen
Designed by 84 Lumber supplying and installing (excluding trim) cabinets,
pantry, laminated counter-top, and req. trim.
(Appliances not included in the price) |
***Bathroom
package includes 3-Piece shower surround with fixtures, sink with fixtures
and storage base, wall mount cabinet, framed-in mirror and cabinet, laminated
flooring and low-flow toilet
|